
SYSTEM MECHANISM
Plug and Abandonment (P&A)
Slot recovery is a key technique in the oil and gas decommissioning market, particularly for offshore platforms, where well slots are limited by the platform’s structural design. It involves the plug and abandonment (P&A) of an existing, depleted, or non-producing wellbore below a selected kick-off point.
By using the Prime Slot Recovery System, it allows operators to maximize the productive life of mature assets and extend field economics in a cost-effective manner compared to installing new platforms or drilling entirely new wells. It typically includes advanced casing recovery, section milling, or specialized cutting and abandonment technologies to clear the slot safely and reliably while meeting stringent environmental and regulatory requirements.
As the global decommissioning wave accelerates with aging infrastructure, the Prime Slot Recovery System helps bridge the gap between end-of-life operations and full removal, optimizing asset value and reducing overall decommissioning expenditures.
Precision Kick-Off Points
Utilizing high-precision sensors, the Slot Recovery System identifies the optimal kick-off point. This allows for lateral drilling into new reservoirs while utilizing the structural strength of existing platform slots.
Structural Severance
Once the transition is complete, our patented cutter technology performs a rapid severance of redundant structural members, clearing the path for new production equipment without compromising platform stability.
PRECISION ENGINEERING IN ACTION
UNRIVALED SAFETY
The safest severance solution on the international marine market, utilizing patented technology for maximum precision.
COST REDUCTION
Drastically reduced personnel requirements and faster cycle times per cut optimize project budgets efficiently.
TECHNICAL PRECISION
Engineered for operational simplicity and speed, ensuring high-performance results in challenging industrial environments.







